Track record
El Safa’s track record — 26 years across Egypt
More than 300 projects in ten governorates, from museums and treatment plants to bridges, tanks and power stations.
2026 · GLS tanks
Two 16 m high GLS tanks for the water treatment plant at Lesaffre Egypt, New Nubaria — with Veolia
2020 · GLS tanks
500 m³ GLS tank for an Armed Forces water facility — supply and erection
2017 · Bridges and infrastructure
Rehabilitation of King Farouk Bridge, Minya Governorate
2014 · Solar energy
Solar-powered street lighting poles, Red Sea Governorate
2025 · HVAC
Heating, ventilation and air-conditioning for the outpatient building, Nasser Institute, Cairo
2022 · GLS tanks
Brine collection tank at the New Capital combined-cycle power plant, with Elsewedy Electric
2016 · Museum works
Mallawi Museum, Minya
2006 · Museum works
Imhotep Museum, Saqqara
2005 · Water treatment
Chlorine injection unit, Manqabad, Assiut
2003 · Industrial wastewater
Industrial wastewater treatment plant, Galfa Metal factory, Obour
2011 · Sewage treatment
Sewage treatment plant, Taba, South Sinai
2008 · Fire protection
Firefighting works at the Marea antiquities store, Borg El Arab, Alexandria
2015 · Construction
Complete specialised structural works for a residential and commercial tower, Champollion Street, Cairo
2006 · Restoration
Facade restoration, Kom Oshim Museum, Fayoum
2012 · Museum works
Museum storage facility, San El-Hagar, Sharkia Governorate
2009 · Rehabilitation
Rehabilitation of Khaled Bin Al-Walid School, Luxor Governorate
2010 · Mechanical and fire protection
Mechanical and firefighting works at the Egyptian Museum, Cairo
Museum works
Beni Suef Museum
Some of our work